top of page
Berea Ladderback
Build Schedule
  • Mill your parts (or order them from the Student Store)

  • Steam bend your rear legs and slats

  • Make the Slat Mortising Jig

​

​

  • Prepare the rung blanks for drying in the light bulb kiln

  • Shape a practice leg

  • Make a flexible stick

​

​

  • Shape the rear legs

  • Make the mortising platform and risers

  • Prepare your turning stock

​

​

  • Turn the dummy parts

  • Make the joy stick

  • Turn the rungs

  • Turn the front legs (can be done now or in Week 6)

  • Prepare the arm blanks for drying in the light bulb kiln

  • Get the arm pin blanks into the kiln

​

​

  • Drill the rear rung mortises

  • Fit and shape the slats

​

​

  • Front leg shaping

  • Arm shaping - Phase 2

  • Turn the arm pins

  • Final rear leg shaping​

  • Build the assembly jig

​

​

  • Drill the front rung mortises

  • Drill the side rung mortises in the rear legs

  • Assemble the front panel

  • Drill the side rung mortises in the front panel

​

​

  • Main assembly

  • Pin the slats

  • Install the Arms

  • Level the Chair

​

Spring Break | Mar 17-23, 2025

​

  • If you've fallen behind, this is your chance to catch up.

  • If you're on schedule, I recommend sanding and getting some finish on your assembled frame.

  • No tasks due this week

  • No meetings this week

  • I'll be checking the Forum on a regular basis - If you have a question, please post it there

​

​​

  • Weave the seat​ with Hickory Bark

  • Weave the Seat with Split Reed

​

​

  • Graduation!

​

bottom of page